TheDoctor02My 02 obsession
About this Entry
Posted by: thedoctor02

Visit thedoctor02's Xanga Site

Original: 6/5/2008 11:02 AM
Views: 23
Comments: 0
eProps: 0

Read Comments
Post a Comment
Back to Your Xanga Site



Thursday, June 05, 2008

June update

 Here it is June already.  Wow.  Did we have a May?

May was a slow month for project work, but I do have some things to report.

- Fabbed vertical yolk to serve as CSB support.  It's held in place by three bolts, is very sturdy, and can be removed in a few minutes if needed.  Driveline adjustments are easy.
- Rear shift linkage support is more or less done.  I don't really like the way it turned out as there is a little slack in the movement, but I should be able to work that out with some spacers before I put the driveshaft in permanently.
- I found an exhaust on ebay, bought it, FedEx lost it and I'm now in the claims process.  Found another one, an MSDS with custom downpipe for 2002, that should be shipped out in a week or so.
- Cut a section of the spare well out to accommodate the 4" x 9" magnaflow muffler.  Formed a 90deg section to fill in the cutout, need to remove the tank and weld it in.  Also need to remember to bore holes in the rear boxed sections for the bumper mounts...
- Started re-running the wiring to the headlight, etc.  With the new nose section framing I'll need to extend some of the wiring to the windshield washer bottle, etc.
- Have in installed most of the front brake lines and fittings as of last night.  Still need to get the backing plates, calipers and flexible lines on.

 Posted 6/5/2008 11:02 AM - 23 Views - 0 eProps - 0 comments

Give eProps or Post a Comment

Choose Identity
(?)
 
Give eProps (?)
Post a Comment
Add Link | Preview HTML comment help 
  • Say it with Minis! (?)

Profile Pic:
Default  |  Choose »  (?)



Back to thedoctor02's Xanga Site!
Note: your comment will appear in thedoctor02's local time zone:
GMT -05:00 (Eastern Standard - US, Canada)