TheDoctor02My 02 obsession
About this Entry
Posted by: thedoctor02

Visit thedoctor02's Xanga Site

Original: 4/7/2008 1:57 PM
Views: 55
Comments: 1
eProps: 2

Read Comments
Post a Comment
Back to Your Xanga Site


Who gave the eProps?
2 eProps!2 eProps! 2 eProps from:
hogpie


Monday, April 07, 2008

Checkpoint

 Coilovers are now done.  Thanks to Mike O'hara I was able to get the coilover sleeves turned down to fit the strut tubes and mate properly with the glan nuts.  Following that, it turns out that 1.5" OD 1/4" wall aluminum pipe is fairly common, so I picked up a foot and made some strut tube spacers to get the inserts to the correct height.  A little trimming is all it took to get everything mated snugly.

The result is pretty:



Brake lines... what a pain.  So far I've dropped over $50 on tubing and can't use any of it.  The wall thickness it too high, so it just squeezes out of the flaring tool before the walls give.  I've turned to cheaper premade lines that use thinner walled (but standard) tubing.  This is working fairly well.

Once the lines are fitted, it all comes apart so paint can go down in the engine bay.

Just a few other checklist items prior to paint:

- Drill holes for 3rd engine brace- Undercoat tunnel and surrounding areas
- Drill holes for 02 sensor mount
- Weld on tabs for oil cooler and radiator fan
 Posted 4/7/2008 1:57 PM - 55 Views - 2 eProps - 1 Comment

Give eProps or Post a Comment

1 Comment

Visit hogpie's Xanga Site!
I am interested in buying you car. What is left to do on it before it is street ready. I just totaled my 75 yesterday that I owned for 15 years yesterday and am looking for a new one. Please let me know...thanks....steve
Posted 8/5/2008 12:17 AM by hogpie - reply


Choose Identity
(?)
 
Give eProps (?)
Post a Comment
Add Link | Preview HTML comment help 
Profile Pic:
Default  |  Choose »  (?)



Back to thedoctor02's Xanga Site!
Note: your comment will appear in thedoctor02's local time zone:
GMT -05:00 (Eastern Standard - US, Canada)